Crane Blocks Columbia Heights For 40 Minutes

A tipster sent in these photos of a crane lift at the building being renovated at 183 Columbia Heights.

No trees were harmed during this operation. The street was blocked for only 40 minutes while a crane lifted a huge metal beam to the roof of 183 Columbia Heights, a building formerly owned by the Jehovahs Witnesses. The building has been undergoing a renovation which is supposedly near completion. The time listed on the photo is actually two hours earlier than real time.

Share this Story:

,

  • Steve

    Only 40 minutes! That’s pretty impressive for such a tall building. I saw a crane take a whole day one time…